中文
English

A must-see丨The basic specifications of the swimming pool water treatment equipment room! ! !

2022-11-29

The swimming pool circulating water purification equipment room is generally composed of a balance pool (or balance pool), circulating water pumps, filters, disinfection equipment, heat exchangers, dosing facilities, chemicals and cleaning tool warehouses, and special facilities (diving pools and Safety air wave preparation equipment), system operation operation control equipment, etc. But it will vary depending on the size of its swimming pool, circulating water purification equipment and processes.


Location Design of Swimming Pool Equipment Room


1611652768661080250.png


1. The location of the circulating water purification equipment room should be close to the periphery of the swimming pool to reduce the length of the piping between the swimming pool and the water purification equipment room and improve the hydraulic conditions;


2. It should be close to the side of the outdoor drainage main pipe to facilitate the filter backwash water and timely drainage of the pool;


3. It should be close to the side of the heat source supply direction to facilitate the introduction of the heat source;


4. It should be close to the side of the outdoor main road to facilitate the transportation and safety of equipment and chemicals used in the computer room;


1611652812644034341.png


5. The circulating water purification equipment room is generally combined in a building with a swimming pool, and can also be built together with other equipment room, which is beneficial to the rational use of building area and maintenance management. However, the computer room should be clearly separated from other adjacent rooms. To facilitate management and safe operation;


6. The pool water purification equipment room should be far away from offices, wards, hotel rooms and other rooms that have strict requirements on environmental noise.


The internal design of swimming pool equipment room


1611653343278027531.png


1. The area and height of the equipment room should meet the requirements of equipment layout, operation permission, construction and installation, and maintenance management. According to British data: The design stage of the scheme, according to the water purification process and equipment configuration, can be estimated based on 15% to 30% of the pool area.


2. If the equipment room is located on the ground floor, there should be an equipment transportation entrance that leads directly to the outdoors.


3. When the equipment room is located in the basement or above the ground floor, vertical lifting holes and passages for transportation equipment, chemicals, pipelines and valve accessories should be arranged at appropriate locations. Its size and load-bearing capacity should be determined according to the transportation needs of the largest equipment size.


1611652900981029287.png


4. Arrangement of equipment and facilities in the equipment room:


1. It should be arranged according to the sequence of the pool water purification treatment process to avoid repetition of pipelines;


2. Arrange into different categories according to the different functions of equipment and facilities to facilitate operation and operation;


3. Make necessary separation according to the operating characteristics and requirements of the equipment, so that the entire machine room is clearly partitioned, the equipment layout is overall reasonable, and the operation is convenient. If the equipment room is located on the relevant floor on the ground, the equipment load (empty load and running load), location and foundation should be proposed to the civil structure professional. All equipment, devices, and containers should have a concrete foundation no smaller than 0.10m above the ground or board surface.


1611652918518088228.png


5. The environment in the equipment room is very important to ensure the safe operation of the equipment and extend the service life of the equipment. For example, ozone generators, electrical control equipment and related instruments, and storage of chemicals have their own environmental requirements. Therefore, there must be good lighting, ventilation, and water supply and drainage measures in the machine room.


6. For the rotating equipment and the connected pipes in the computer room on the roof or adjacent or other floors, in order to prevent vibration and noise during operation from affecting the quiet requirements of adjacent and upper and lower floors, effective isolation should be adopted. Shock and noise reduction measures.


7. The fire resistance level and fire protection design of the equipment room should comply with the current national standard "Code for Design of Building Fire Protection" GB 50016.


1611653393492036292.png


8. The equipment room should be provided with entrances and exits to the swimming pool circulating water supply pipes and circulating return water pipes.


9. The pipelines in the machine room are generally exposed, and should be easy to install and operate, and strive to be short in order to reduce water flow resistance. For pipelines laid along the ground, stepping ladders are set at the pedestrian passages when they cannot be crossed. Overhead pipelines should be neatly arranged, and should not be arranged on motors or electrical equipment, and their height from the ground should not affect the passage of staff and the operation of the equipment. The height of the relevant valves opened manually in the equipment room shall be convenient for operation and maintenance. The installation height of the instrument should be convenient for observation.


1611652948338068854.png


10. When centralized control is adopted for the water quality detection and control of the equipment room and equipment operation, the area of the control room is generally determined according to the number of dials and the number of control cabinets. When not arranged centrally, keep a proper safe distance between electrical devices such as switchboards and water purification equipment.

share